Use the last completed action
Separate initial door locking, water entry, drum movement and final emptying. The sequence can direct assessment towards supply, drainage or programme interruption without choosing a part in advance.
Keep the final state
A warning, locked door and wet load are useful alongside the timeline. An engineer can examine the relevant route instead of treating every water complaint as a pump failure.
